Contract labour monthly evidence checklist

Enter each vendor's monthly totals as reported and as your site recorded them. The checklist flags differences above your tolerance and the evidence still missing, for a reviewer. Totals only: no names, IDs or wages.

Last checked 13 November 2026

Totals only. Do not enter names, ID numbers or wages: they stay with the restricted evidence.

How each vendor month is checked

Difference = vendor figure − site figure; % = |difference| ÷ site figure × 100 (100% when the site recorded none)
Flag when % > the difference allowed, for headcount and for worker-days separately
Missing = a figure not given, or wage register, PF challan / ECR, ESI challan or site attendance summary not received
Sense check: site worker-days above headcount × 31
A vendor and month entered twice is counted once
  • Headcount is the most workers on any day of the month; worker-days the sum of days worked. A half day counts as half.
  • The site figure is your own confirmed attendance. Where it comes from an HR or project system, use that system's confirmed monthly totals; the vendor's figure is what its bill or wage register claims.
  • The result says For review, never compliant: the reviewer still checks the evidence itself.

Worked example (the sample project)

For November 2026, GreenField Turf Systems (sample) reports 8 installers and 176 worker-days; Site B's locked attendance shows 8 and 158. The 18-day difference (11.39%) is above the 2% allowed, and the ESI challan has not come in: the row is For review. Its subcontractor Lawn Crew (sample) reports 3 and 60, the site shows the same, and all four kinds of evidence are in.

Common questions

Why compare vendor and site figures?

A principal employer is answerable for contract workers' wages and contributions when the contractor defaults. A vendor's worker-days that run well above what your site recorded, or a month without wage and PF/ESI proof, is something to look at before you pay its bill.

What counts as the site figure?

The attendance your own site recorded and confirmed for that vendor's workers in the month: the most on any day (headcount) and the sum of days worked (worker-days). Where an HR or project system holds the attendance, use its confirmed totals.

What if the same vendor and month is entered twice?

It is counted once and the repeat is listed, so totals never double.

Should I enter workers' names or Aadhaar numbers?

No. The checklist needs only totals. Worker lists, identity documents and wage registers are personal data: keep them where access is restricted to the people who review them.

Is a clean row proof of compliance?

No. It means the figures agree within your tolerance and you marked the evidence as received. The evidence itself still needs checking by the reviewer.