Short, plain-English definitions of the abbreviations and terms used across this site, with links to the guide or calculator that goes deeper.

Updated 25 October 2026
176 terms

A

AATO
Aggregate annual turnover: GST turnover of all GSTINs on one PAN for the year. It decides e-invoicing, the GSTR-9C requirement and GSTR-3B timing. E-invoice checker →
Abstract of cost
Summary in which measured quantities are totalled by BoQ item and priced: up to date, up to the previous bill and for this bill. It turns the measurement book into the bill amount. RA bill from the MB →
AD bank
Authorised Dealer Category-I bank licensed by RBI to handle foreign exchange; it monitors your EDPMS and IDPMS entries and reports FEMA transactions. EDPMS and IDPMS guide →
Additional fee (ROC)
Late fee for filing an MCA form after the due date: ₹100 a day with no cap for AOC-4 and MGT-7 or MGT-7A, and multiples of the normal fee by length of delay for most other forms. It does not prevent a penalty. ROC filing fee calculator →
ADT-1
Intimation to the RoC of the appointment of a statutory auditor, filed within 15 days of the meeting at which the auditor is appointed. No MGT-14 is filed for it.
Advance tax
Income tax paid in instalments during the tax year: 15%, 45%, 75% and 100% by 15 June, September, December and March. Shortfall attracts interest under s.425 [234C]. Advance tax interest calculator →
AIS
Annual Information Statement on the income-tax portal: the department's record of your reported income, TDS and high-value transactions.
Anchor investor
A qualified institutional buyer allotted shares a day before a book-built issue opens, with a lock-in. Common in main-board IPOs; possible in SME issues.
AOC-4 XBRL
Filing of financial statements in XBRL, required for listed companies and their Indian subsidiaries, companies with paid-up capital of ₹5 crore or turnover of ₹100 crore or more, and Ind AS companies. Banking, insurance, NBFC and housing finance companies are excluded.
Appointed day (MSMED)
Under s.2(b) of the MSMED Act, the day after 15 days from acceptance or deemed acceptance of goods or services. With no written agreement, payment is due before it and interest at three times the bank rate runs from it. MSME interest calculator →
ASMT-10
GST form in which the officer lists discrepancies found on scrutiny of returns under s.61. Reply in ASMT-11; closure in ASMT-12. ASMT-10 reply guide →
ATC (GeM)
Additional Terms and Conditions that a buyer adds to a GeM bid through GeM's own module, such as scope, payment terms, inspection and certificates. A missing ATC document can lead to rejection of the offer. GeM bid checklist →

B

Bank guarantee (BG)
A bank's undertaking to pay a beneficiary if the customer fails to perform. Tenders use bid-security and performance guarantees; banks charge commission and usually take margin. BG cost calculator →
Bid Security Declaration
Signed undertaking given instead of EMD, accepting debarment for a stated period if the bidder withdraws or changes its bid during validity, or fails to sign the contract or give performance security. A buyer can use it only with the competent authority's approval. EMD, BG and PBG →
Bid validity
Period after the bid due date during which the bidder's offer stays open and cannot be withdrawn. The Works Manual (2025) takes 90 days where the tender is silent, and bid security should stay valid 45 days beyond it. How to read a CPPP tender →
Bidding capacity
Test of whether a bidder can take on more work: A × M × N − B, where A is the best annual value of works in the last five years, M a multiplier, N the completion period in years and B existing commitments due in that period. Tender eligibility calculator →
BoE
Bill of entry: the customs declaration for imported goods. It creates the IDPMS entry and carries the IGST paid on import. IDPMS guide →
Book building
Price discovery in an IPO within a price band, with allotment at the price set after bids close.
BoQ
Bill of quantities: the itemised list of work with descriptions, units and quantities against which the bidder quotes rates. On CPPP only the bidder's cells may be filled; a modified template can lead to rejection. Site survey before the BoQ →
Borrowing limit (s.180)
Board needs a special resolution to borrow above paid-up capital, free reserves and securities premium; applies to public companies. Borrowing and investment limits →
Break-even
Sales level at which contribution covers fixed costs, so profit is nil. Break-even calculator →
BRS
Bank reconciliation statement: matches the bank ledger in the books with the bank statement, listing items in transit.
BRSR
Business Responsibility and Sustainability Report under LODR Reg 34(2)(f). Applies to the top 1,000 listed companies by market cap, so not in practice to SME-listed companies. SEBI for SME-listed companies →

C

CARO
Companies (Auditor's Report) Order 2020: matters the statutory auditor must report on, such as fixed assets, inventory, loans and statutory dues.
Caution list
RBI list of exporters with long-outstanding export proceeds; listed exporters can ship only against advance payment or an irrevocable letter of credit. Caution listing →
CC limit
Cash credit: a running working-capital facility secured on stock and receivables, drawn up to the drawing power. Drawing power calculator →
CFO
Cash flow from operations: cash generated by the business before investing and financing flows. Also used for the Chief Financial Officer, a KMP.
Check measurement
Re-measurement or verification by the owner's engineer of quantities recorded in the measurement book before payment. In CPWD, senior officers also test check a part of the measurements. RA bill from the MB →
CIN
Corporate Identity Number given by the Registrar of Companies; it encodes listing status, state, year and type.
Class-I local supplier
Under the Public Procurement (Preference to Make in India) Order, a supplier whose item has local content of at least 50%, or a higher figure notified for it. Only Class-I suppliers get purchase preference. Make in India preference →
Class-II local supplier
A supplier whose item has local content of at least 20% but below the Class-I figure. It may bid in domestic tenders but gets no purchase preference. Make in India preference →
Clause 10CC
Price variation clause of the CPWD General Conditions of Contract, applied to 85% of the work done in each quarter with indices for materials and the unskilled minimum wage for labour. It also adjusts downward when prices fall. Price variation explained →
Composite supply
Under s.2(30) of the CGST Act, two or more supplies naturally bundled and supplied together, one of which is the principal supply. Under s.8 it is taxed at the rate of the principal supply. GST on works contracts →
Contract labour licence
Licence a contractor needs under s.47 of the OSH Code 2020 when employing 50 or more contract workers, valid for five years. It replaced the licence under the CLRA Act 1970. Contract labour licence guide →
Corrigendum
Formal amendment to a published tender, changing dates, quantities, specifications or conditions. It binds every bidder whether or not they saw it, so check the tender page again before freezing the bid. How to read a CPPP tender →
CPI-IW
Consumer Price Index for Industrial Workers published by the Labour Bureau. Many price variation clauses use it for the labour component; CPWD clause 10CC uses the minimum wage instead. Price escalation calculator →
CPPP
Central Public Procurement Portal (eprocure.gov.in), on which central ministries, departments and public sector undertakings publish tenders, corrigenda and results. Bids are uploaded, frozen and signed with a digital signature certificate. How to read a CPPP tender →
CSR
Corporate social responsibility under s.135 of the Companies Act: 2% of average net profit for companies above the net-worth, turnover or profit thresholds. CSR calculator →
Customs duty
Basic customs duty, social welfare surcharge and IGST levied on imports; IGST is creditable as ITC. Customs duty calculator →
CWIP
Capital work in progress: cost of assets under construction or installation, capitalised when ready for use. Schedule III requires an ageing. Depreciation calculator →

D

Defect liability period
Period after completion during which the contractor must make good defects at its own cost. Retention or security deposit and performance security are held until it ends; the contract fixes its length. Retention and security deposit →
Deviation
Change in the quantity of a BoQ item beyond the contract quantity, as the work is executed. In CPWD contracts clause 12 governs it, and quantities beyond the permitted limit may be paid at a different rate. RA bill from the MB →
DIN
Document Identification Number on income-tax and CBIC communications; verify it before replying. Also the Director Identification Number issued by MCA. Notice guides →
DIR-8
Director's declaration that he or she is not disqualified under s.164(2), required before appointment or re-appointment. Many companies also collect it at the first board meeting of each year.
DPR (daily progress report)
Site report of each day's work done, labour and machinery deployed, materials received and hindrances or hours lost. It is the dated record that measurement, billing and extension claims rely on. K-Projects →
DPT-3
Annual MCA return of deposits and outstanding receipts not treated as deposits, due 30 June. Compliance chart →
DRC-01A
GST pre-show-cause intimation of tax ascertained. Optional for the officer since October 2024; paying at this stage avoids penalty in non-fraud cases. Other notices →
DRC-03
GST form for voluntary payment of tax, interest or penalty, used to pay amounts accepted in a scrutiny or audit. Paying after ASMT-10 →
DRHP
Draft red herring prospectus: the draft offer document. For SME issues it is filed with the exchange and opened for 21 days of public comments. SME IPO readiness →
DSCR
Debt service coverage ratio: cash available for debt service divided by principal and interest due. Lenders commonly look for 1.25 or more. DSCR calculator →
DSR
Delhi Schedule of Rates published by CPWD: standard rates for items of building and civil work used by departments to prepare the estimated cost put to tender. Bidders quote against the BoQ, not the DSR itself. Site survey before the BoQ →

E

E-invoice
Invoice reported to the GST Invoice Registration Portal and issued with an IRN and QR code; mandatory above the notified AATO. E-invoice checker →
E-way bill
Electronic document for movement of goods above the threshold value, generated on the EWB portal; mismatches with GSTR-1 often trigger scrutiny. E-way bill checker →
eBRC
Electronic bank realisation certificate generated on the DGFT platform from bank data, used as proof of export realisation for incentives and GST refunds.
ECB
External commercial borrowing: a loan from a non-resident lender under FEMA, subject to eligibility, end-use and cost limits, reported monthly in ECB-2. FEMA filing dates →
ECR
Electronic challan cum return filed with EPFO for each wage month, listing every member's UAN, wages and contributions, and generating the challan for payment. PF and ESIC for contractors →
EDF
Export declaration form; from 1 October 2026 service exporters file it within 30 days from the end of the invoice month.
EDLI
Employees' Deposit Linked Insurance: life cover for PF members funded by the employer's contribution, with nothing deducted from the employee. The 2026 scheme replaced the 1976 scheme. PF and ESIC for contractors →
EDPMS
Export Data Processing and Monitoring System: RBI database in which each shipping bill stays open until the AD bank links the export proceeds. EDPMS guide →
EMD
Earnest money deposit or bid security: money or an instrument securing the bid, forfeited if the bidder withdraws during validity or fails to sign or give performance security. GFR 2017 Rule 170 puts it ordinarily at 2% to 5% of the estimated value; GeM takes none below ₹5 lakh. EMD calculator →
EMI
Equated monthly instalment repaying a loan's principal and interest. EMI calculator →
EPF
Employees' Provident Fund: 12% of wages from the employee and 12% from the employer, part of the employer's share going to EPS. Contributions are mandatory on wages up to ₹25,000 a month from 17 September 2026. PF and ESIC calculator →
EPS
Employees' Pension Scheme: 8.33% of wages up to the ceiling, taken out of the employer's 12% PF contribution, at most ₹2,083 a month on the ₹25,000 ceiling. The employee does not contribute. PF and ESIC calculator →
ESIC
Employees' State Insurance: health and cash benefits for employees earning up to ₹21,000 a month, funded at 0.75% by the employee and 3.25% by the employer. PF and ESIC calculator →
Extension of time
Formal extension of the completion date for delays the contractor is not responsible for, such as hindrances, extra work or force majeure. In CPWD contracts the contractor applies within 14 days of the event under clause 5.4. Extension of time guide →
Extra item
Work not in the BoQ that the owner orders during execution, priced under the contract's rate-fixing clause. It should be sanctioned before it is billed. RA bill from the MB →

F

Facilitation Council (MSEFC)
State Micro and Small Enterprises Facilitation Council that hears delayed payment references under s.18 of the MSMED Act, by conciliation and, if that fails, arbitration.
FC-GPR
FEMA report of shares issued to a foreign investor, filed on the FIRMS portal within 30 days of allotment. FEMA filing dates →
FCFE
Free cash flow to equity. NSE Emerge requires it to be positive in 2 of 3 years, on the formula revised in April 2026. Eligibility tests →
Final bill
The last bill on completion, reconciling all quantities with the measurement book and adjusting everything paid in running bills, which are only advances against it. RA bill from the MB →
FIRC
Foreign inward remittance certificate issued by a bank. In EDPMS the bank reports the remittance as an IRM.
Fixed-term employment
Employment for a fixed period on the same hours, wages and benefits as permanent staff doing similar work. A fixed-term employee becomes eligible for gratuity after one year of service. F&F calculator →
FLA return
Annual return on foreign liabilities and assets filed with RBI by 15 July by entities with FDI or ODI. FEMA filing dates →
Form 145 / 146
Income-tax Act 2025 forms for foreign remittances: Form 145 [15CA] by the remitter, Form 146 [15CB] the accountant's certificate. Form 145/146 checker →
Full and final settlement
Final payment of all dues to a departing employee: salary, leave encashment, bonus, notice pay and gratuity, less recoveries. Wages are due within two working days under s.17(2) of the Code on Wages; gratuity within 30 days. F&F calculator →

G

GCP
General corporate purposes: unspecified use of IPO proceeds. For SME issues capped at the lower of 15% of the issue or ₹10 crore. Issue structure rules →
GeM
Government e-Marketplace: the online marketplace through which government buyers purchase goods and services by direct purchase, L1 purchase, bid or reverse auction. Seller details are validated against PAN, MCA 21, Udyam and GSTN data. GeM bid checklist →
GeM bid
A competitive bid created by a buyer on GeM, mandatory above ₹10 lakh, with its own technical parameters, quantity, EMD, performance security, bid validity and additional terms. Technically qualified bidders are ranked on price, sometimes followed by a reverse auction. How GeM bids are evaluated →
GeM direct purchase
Purchase on GeM without bidding, allowed up to ₹50,000 from any seller meeting the quality, specification and delivery period, under GFR Rule 149 as amended in July 2024. From above ₹50,000 to ₹10 lakh the buyer orders from the L1 seller among at least three manufacturers. How GeM bids are evaluated →
Gratuity
Lump sum payable under the Payment of Gratuity Act at 15 days' wages per year of service after 5 years; a defined-benefit obligation valued actuarially under AS 15 or Ind AS 19. Gratuity calculator →
GST TDS (s.51)
Tax deducted by government departments, local authorities and notified bodies at 2% of the taxable value when the contract value exceeds ₹2.5 lakh excluding tax. The supplier gets it as credit in its electronic cash ledger. GST TDS guide →
GSTR-1
Monthly or quarterly GST return of outward supplies. Compliance chart →
GSTR-2B
Static monthly statement of input tax credit available from suppliers' filed returns; the base for ITC in GSTR-3B. GSTR-2B reconciliation →
GSTR-3B
Monthly or quarterly GST summary return in which tax is paid and ITC claimed. GST late fee and interest →
GSTR-7
Monthly return of GST TDS filed by the deductor by the 10th of the following month. The supplier accepts the entry on the portal before the credit reaches its cash ledger. GST TDS guide →
GSTR-9 / 9C
GST annual return, and the self-certified reconciliation statement for larger taxpayers.

H

Hindrance register
Site record of each event that stops or slows work, with dates of start and removal signed by both sides, used to support extension of time. CPWD replaced the physical register with an online module for works tendered from 19 February 2019. Hindrance register guide →

I

ICDR
SEBI (Issue of Capital and Disclosure Requirements) Regulations 2018. Chapter IX governs SME issues. SME IPO readiness →
IDPMS
Import Data Processing and Monitoring System: RBI database in which each bill of entry stays open until matched with the payment. IDPMS guide →
IEC
Importer Exporter Code issued by DGFT, the PAN-linked identifier for import and export.
IMS
Invoice Management System on the GST portal: the buyer accepts, rejects or keeps pending each supplier invoice before GSTR-2B is finalised. GSTR-2B reconciliation →
INC-20A
Declaration of commencement of business that a company with share capital files under s.10A of the Companies Act, confirming subscribers have paid for their shares, within 180 days of incorporation. ROC compliance calendar →
Ind AS
Indian Accounting Standards converged with IFRS. Companies listed on an SME exchange are exempt and may follow the older Accounting Standards.
Integrated Filing
Combined quarterly exchange filing (Governance and Financial) introduced in 2025, replacing several separate LODR filings. Periodic filings →
IP number (ESIC)
Insurance number allotted by ESIC to an insured person, used for contributions and benefits across employers. New joiners at site should be added in the month they join. PF and ESIC for contractors →
IRP
Invoice Registration Portal for e-invoices. In insolvency, IRP also means the interim resolution professional.
ISIN
International Securities Identification Number allotted by the depositories to each class of security; needed before shares can be held in demat. Conversion and demat →
ITC
Input tax credit: GST paid on purchases set off against output tax, subject to s.16 conditions and s.17(5) blocks. ITC reversal calculator →

K

KMP
Key managerial personnel under s.203: MD, CEO or manager, whole-time director, company secretary and CFO. Companies Act guide →

L

L1
The lowest evaluated bid among technically qualified bidders, and the bidder who quoted it. Award to L1 can still be shared with eligible MSEs or Class-I local suppliers who match the L1 price. How GeM bids are evaluated →
Labour cess (BOCW)
Building and construction workers' welfare cess, now levied under s.100 of the Code on Social Security 2020 at the notified 1% of the cost of construction, excluding land. Government works deduct it from each bill. Labour cess calculator →
LC
Letter of credit: a bank's undertaking to pay the seller against compliant documents.
Leave encashment
Payment for unused earned leave. On retirement or leaving, a non-government employee's receipt is exempt up to the statutory limits with a lifetime cap of ₹25 lakh under s.19 [10(10AA)]; encashment in service is taxable salary. Leave encashment calculator →
LEI
Legal Entity Identifier, required by RBI for large borrowers and for cross-border transactions above the specified amount.
Liquidated damages
Pre-agreed compensation for delay, limited by s.74 of the Indian Contract Act 1872 to reasonable compensation up to the named sum. CPWD GCC 2023 clause 2 allows up to 1% a month of the accepted tendered value, capped at 10%. LD calculator →
Local content
Value added in India: total value of the item, excluding net domestic indirect taxes, less imported content including customs duty, as a percentage of total value. It decides Class-I and Class-II status and is self-certified at bid stage below ₹10 crore. Make in India preference →
LODR
SEBI (Listing Obligations and Disclosure Requirements) Regulations 2015. SME-listed companies get exemptions under Reg 15(2). SEBI for SME-listed companies →
LSF
Late submission fee paid to regularise a delayed FEMA report (such as FC-GPR or FLA) instead of compounding. FEMA filing dates →

M

Market maker
Broker obliged to quote two-way prices in an SME scrip. Compulsory for 3 years from listing. SME market rules →
MBP-1
Director's annual disclosure of interest in other entities, given at the first board meeting of each financial year.
Measurement book (MB)
The record in which work done on site is measured and entered item by item, and from which every bill is prepared. Entries are checked by the owner's engineer before they count for payment. RA bill from the MB →
MGT-7
Annual return of a company filed with the RoC within 60 days of the AGM. ROC filing fee calculator →
MGT-7A
Abridged annual return filed by one person companies and small companies instead of MGT-7, within 60 days of the AGM or the date it should have been held.
MGT-8
Certificate by a company secretary in practice on the annual return, required for listed companies and those with paid-up capital of ₹10 crore or turnover of ₹50 crore or more.
Minimum wages
Lowest wage rates notified by the appropriate government for each skill level and area under the Code on Wages 2019, which cannot be fixed below the central floor wage. Escalation clauses such as CPWD 10CC track the unskilled rate. Price variation explained →
Mobilisation advance
Advance paid to a contractor at the start to mobilise men and machinery, secured by bank guarantee and recovered from running bills. Under CPWD GCC 2023 clause 10B it is up to 10% of the tendered amount at 8% simple interest. Mobilisation advance calculator →
MPBF
Maximum permissible bank finance: the working-capital limit a bank will sanction, traditionally 75% of the working-capital gap. Working capital calculator →
MPC
Minimum promoters' contribution: 20% of post-issue capital, locked in for 3 years. Lock-in rules →
MSE purchase preference
Under the Public Procurement Policy for MSEs, MSEs quoting within L1+15% may supply up to 25% of the tendered value by matching the L1 price, where L1 is a non-MSE. Eligible MSEs are also exempt from bid security and tender fee, but not performance security. MSE exemption and preference →
MSME 45-day rule
Payments to micro and small suppliers are due within 45 days of acceptance; late payment carries interest and is deductible only when paid under s.37(2)(g). MSME payment tracker →
MSME Samadhaan
Ministry of MSME portal on which a micro or small supplier files a delayed payment reference, which is routed to the state's Facilitation Council.
MSME-1
Half-yearly MCA return of dues to micro and small enterprises outstanding beyond 45 days. MSME-1 →

N

NIT
Notice inviting tender: the published notice that announces a tender and states the work, estimated cost, eligibility, EMD, bid validity and key dates. Where the NIT and a manual differ, bidders follow the NIT and any corrigendum. How to read a CPPP tender →
Notice pay
Pay in lieu of the notice period, paid by the employer when it releases an employee early or recovered from an employee who leaves without serving notice, as the appointment letter or standing orders provide. It is taxable salary. F&F checklist →
NTA
Net tangible assets. BSE SME requires at least ₹3 crore in the last full year. SME IPO eligibility checker →

O

ODI
Overseas direct investment by an Indian entity under the FEMA (Overseas Investment) rules, reported through the AD bank. FEMA filing dates →
OFS
Offer for sale: existing shareholders sell in the IPO. In SME issues capped at 20% of the issue and 50% of each seller's holding. Issue structure rules →

P

PAS-3
Return of allotment of shares filed with the RoC. Event-based forms →
PBC list
Provided-by-client list: schedules and documents the auditor needs from the company to complete the audit. Period-close checklist →
Performance security (PBG)
Security given by the successful bidder after award, often as a performance bank guarantee, to secure performance of the contract. The Works Manual band is 3% to 10% of contract value, and it stays valid for 60 days beyond all obligations including the defect liability period. EMD, BG and PBG →
PIT
SEBI (Prohibition of Insider Trading) Regulations 2015: codes of conduct, trading window and disclosures for listed companies. Day-one set-up →
Practising company secretary
A member of ICSI holding a certificate of practice. Signs MGT-7 where the company has no company secretary, gives the MGT-8 certificate and the MR-3 secretarial audit report, and certifies e-forms.
Pre-bid meeting
Meeting or query window, fixed in the NIT, where bidders raise written questions on the tender before submission. Answers that change the tender are issued as a corrigendum. How to read a CPPP tender →
Price variation clause
Contract clause that adjusts payment up or down for changes in prices of materials, labour and fuel after the base date, using published indices and fixed component shares. Price variation explained →
Principal employer
The establishment for which a contractor's workers do the work. It is liable to pay contract labour if the contractor fails to pay wages, and for PF where the contractor defaults, and recovers from the contractor's bills. PF and ESIC for contractors →
Professional tax
State tax on professions, trades, callings and employments, deducted by employers from salary. Article 276(2) of the Constitution caps it at ₹2,500 per person per year. Professional tax calculator →
PTRC / PTEC
Maharashtra professional tax certificates: PTRC is the employer's registration to deduct and pay tax on salaries; PTEC is the enrolment of a company, firm or professional to pay its own tax. Most employers need both. Professional tax by state →

Q

QCBS
Quality and cost based selection: bids are ranked on a weighted combination of technical and financial scores stated in the tender, mainly for consultancy. Make in India purchase preference does not apply where evaluation includes such non-price criteria. Make in India preference →

R

RA bill
Running account bill: an interim bill on cumulative quantities measured to date, paying the difference from the previous bill. Deductions include security deposit, advance recoveries, TDS under s.393 [194C], GST TDS and labour cess. RA bill deductions calculator →
RCM
Reverse charge mechanism: the recipient pays GST instead of the supplier on notified supplies such as GTA, legal services and import of services. RCM checker →
Reg 30
LODR regulation requiring disclosure of material events to the exchange, generally within 24 hours. Event-based disclosures →
Reg 33
LODR regulation on financial results; SME-listed companies file half-yearly within 45 days and annual within 60 days. Periodic filings →
Restated financials
Financial statements for the offer document, restated for the ICDR periods with adjustments for errors and policy changes, examined by a peer-reviewed auditor. Lesson 3 →
Retention money
Part of each running bill held back by the owner and released after the defect liability period, to cover defects and outstanding obligations. The contract's retention or security deposit clause sets the rate. Retention and security deposit →
Reverse auction
Online price contest after technical evaluation in which qualified bidders lower their prices in real time. On GeM a lower bid in the last 15 minutes extends the end time by 15 minutes, and the bid's elimination rule decides who takes part. How GeM bids are evaluated →
RHP
Red herring prospectus: the offer document filed with the RoC before the issue, without the final price. IPO process →
RoC
Registrar of Companies, the MCA office that registers companies and receives filings.
RPT
Related party transaction, governed by s.188 of the Companies Act and, for larger SME-listed companies, LODR Reg 23. Reg 23 for SMEs →

S

s.37(2)(g)
Income-tax Act 2025 provision [43B(h)] allowing payments to micro and small enterprises only in the year paid, if paid late. MSME tax disallowance →
s.393
Income-tax Act 2025 section for TDS on payments other than salary, replacing the 194-series sections of the 1961 Act. TDS code finder →
SAST
SEBI (Substantial Acquisition of Shares and Takeovers) Regulations 2011: disclosures at 5% and every 2% change, and the open-offer triggers. Event-based disclosures →
Schedule of quantities
Another name for the bill of quantities, common in CPWD and state works tenders: the items, units and estimated quantities the contractor prices. Site survey before the BoQ →
SCORES
SEBI's online investor complaints system; listed companies must register and resolve complaints within 21 days. Day-one set-up →
SDD
Structured digital database of persons with whom UPSI was shared, required under PIT Reg 3(5). Day-one set-up →
Secured advance
Advance paid against materials brought to site for use in the work, secured on those materials. It is recovered from later bills as the materials are built into the work. RA bill deductions calculator →
Security deposit
In CPWD contracts, 2.5% of the gross amount of each running and final bill deducted until it reaches 2.5% of the tendered amount (clause 1A), separate from the performance guarantee. It is refunded under clause 17 after the defect period and the final bill. Retention and security deposit →
SFT
Statement of financial transactions filed by specified entities reporting high-value transactions to the income-tax department.
Similar works
Past works of the nature the tender defines, used as the experience test: typically three completed works of 40%, two of 50% or one of 80% of the estimated cost in the last seven years. Old values are raised at 7% a year simple under the Works Manual (2025). Tender eligibility calculator →
Site survey
Visit to record site conditions, access, levels, existing services and client-supplied items before pricing a BoQ. Tenders usually deem the contractor to have satisfied itself about the site. Site survey checklist →
Small company
Private company with paid-up capital up to ₹10 crore and turnover up to ₹100 crore (from December 2025). A listed company can never be one. Companies Act applicability →
SOFTEX
Former form for software exports, replaced by the EDF from 1 October 2026.
SRN
Service request number generated when an e-form or payment is submitted on the MCA portal. It identifies the filing and is used to track its status and the payment challan. ROC filing fee calculator →
Statutory bonus
Bonus under the Code on Wages for employees earning up to ₹21,000 a month who worked at least 30 days in the year: 8.33% to 20% of wages capped at ₹7,000 a month or the minimum wage, whichever is higher. Bonus calculator →

T

Tax audit
Audit under the Income-tax Act, reported in Form 26 [3CA/3CD], for businesses above the turnover threshold.
Tax year
The Income-tax Act 2025 term for the financial year in which income is earned, replacing previous year and assessment year. Income tax regime calculator →
TDS
Tax deducted at source: tax withheld by the payer and deposited with the government, reported in quarterly statements. TDS interest calculator →
TReDS
Trade Receivables Discounting System: platforms where MSME invoices on large buyers are financed. Companies with turnover above ₹250 crore must register. TReDS →
Two-bid system
Tender in which the technical and commercial documents go in one cover and the price in another; the financial cover is opened only for bidders who qualify technically. GFR 2017 Rule 163 describes it, and works tenders use the same idea. How to read a CPPP tender →

U

UAN
Universal Account Number allotted by EPFO to a PF member, which stays the same across employers. Contractors report each worker's UAN to the principal employer every month. PF and ESIC for contractors →
Udyam
Registration of micro, small and medium enterprises on the Udyam portal; the supplier's Udyam certificate decides MSMED Act protection. Who is an MSME →
UPSI
Unpublished price sensitive information about a listed company or its securities; trading while holding it is prohibited. Insider trading →

W

Wages (labour codes)
The single definition used across the labour codes: basic pay, dearness allowance and retaining allowance. Where excluded allowances exceed half of total remuneration, the excess is added back to wages. PF and ESIC for contractors →
Working capital gap
Current assets less current liabilities other than bank borrowings; the base for working-capital limits. Working capital calculator →
Works contract
Under s.2(119) of the CGST Act, a contract for construction, erection, repair or similar work on immovable property involving transfer of property in goods. Schedule II treats it as a supply of services, at 18% for most contracts.
WPI
Wholesale Price Index published by the Office of the Economic Adviser, DPIIT. Price variation clauses commonly use its item indices for cement, steel, bitumen, fuel and other materials. Price escalation calculator →

X

XBRL
Machine-readable reporting format used for financial statements filed with MCA (AOC-4 XBRL) and for exchange filings.