What the software has to do
A running account (RA) bill pays for work measured so far. On a measured contract, every line in it should trace back to a checked entry in the measurement book (MB). The full manual chain is set out in preparing an RA bill from the measurement book. Software earns its place when it keeps that chain intact without retyping:
- Measurements against the BOQ. Each entry is tied to a BOQ item, recorded as Nos × L × B × D or a direct quantity, with deductions for openings.
- A check before it counts. The owner's engineer checks or verifies the entry; until then it does not reach a bill.
- Cumulative quantities. Each bill restates the quantity measured to date and pays the difference from the previous bill, so earlier errors correct themselves.
- The abstract. Previous, this-bill and up-to-date quantities and amounts at BOQ rates, by item, for the bill period.
- Deductions and net payable. TDS on the contractor payment, GST TDS on government contracts, labour cess, retention or security deposit and mobilisation advance recovery, as the contract says.
- A trail. Who measured, who checked and when, so a query from the client's accounts can be answered from the record.
Excel or RA bill software
| Point | Excel workbook | RA bill software |
|---|---|---|
| Link to the measurement book | Retyped from the paper MB | Abstract built from the MB entries themselves |
| Engineer's check | A signature on paper; not in the file | An entry counts only after the check is recorded |
| Quantity beyond BOQ | Noticed if someone looks | Flagged when the measured quantity passes the BOQ quantity |
| Previous bill | Copied from last month's file | Worked out from the earlier bills |
| Who changed what | Not recorded | Recorded |
| Cost | Nothing extra | A subscription |
A small contractor with one or two jobs and a careful billing engineer can run well on Excel. The case for software grows with the number of sites, bills a month and people entering measurements.
Checklist when you compare tools
- Can site engineers record measurements on the phone, and does an engineer's check gate the entry?
- Does the abstract show previous, this-bill and up-to-date quantities and amounts at BOQ rates?
- Does it warn when a measured quantity passes the BOQ quantity (a variation)?
- Can you print the abstract and export it as CSV for the client's format?
- Where do the deductions and the tax invoice happen, and is that the same system as your books?
- Can the daily progress report, labour and hindrances sit next to the measurements, so a delay claim has evidence?
- How do you get your data out if you stop using it?
How K-Projects does it
K-Projects is the Khanal Group app for contractors' sites. For billing it keeps:
- Measurement book: Nos × L × B × D or a direct quantity per BOQ item, deductions for openings, and an engineer check before an entry counts, with a variation warning past the BOQ quantity.
- RA bill abstract: previous, this-bill and up-to-date quantities and amounts at BOQ rates for any period, ready to print or to download as CSV.
- Link to the contract: the abstract's CSV goes to K-Tender, which matches the lines to the contract BOQ and pre-fills the client RA bill; the tax invoice is made in K-Finance.
- Site evidence: daily progress reports from the phone (even with no signal), labour attendance, hindrances with the hours lost, and weekly and monthly reports.
The deductions are worked out with the free RA bill deductions calculator, which needs no sign-in. See K-Projects for the rest of the app.
What to keep outside the software
No tool replaces the contract. Rates, the deductions that apply, the price variation clause and the payment timeline come from your agreement and, on CPWD works, the General Conditions of Contract. Check the first bills made in any new system line by line against the measurement book before you rely on it.
Common questions
What is RA bill software?
Software that keeps the measurement book for each BOQ item and turns checked measurements into the running account bill abstract: previous, this-bill and up-to-date quantities and amounts at BOQ rates. Good tools also keep the deductions and the audit trail behind each figure.
Can the RA bill be prepared in Excel instead?
Yes, and many contractors do. The risks are formulas that break when rows are added, quantities that no longer match the measurement book, and no record of who checked an entry. Software ties every line of the abstract to a checked entry.
Does K-Projects prepare the client's tax invoice?
No. K-Projects prepares the RA bill abstract from checked measurements. In the Khanal apps the tax invoice for an RA bill is made in K-Finance; K-Tender keeps the contract and its client RA bills.
Does the measurement book entry need an engineer's check?
On a measured contract the owner's engineer checks or verifies the contractor's measurements before they count for payment. In K-Projects an entry counts only after an engineer's check.
Which deductions come off an RA bill?
Typically income-tax TDS on the contractor payment, GST TDS on government contracts, labour cess, retention or security deposit, and recovery of any mobilisation advance, as the contract and the law require. The RA bill deductions calculator works them out.